Views: 0 Author: Site Editor Publish Time: 2026-02-05 Origin: Site
he room temperature must be maintained between 18-22 degrees Celsius for 48 hours before installation and during installation. Do not open the packaging during this acclimatization period;
• It can be installed over most existing hard floor coverings, but the existing floor must be clean, level, dry, and structurally sound. Installation on any type of carpet is prohibited;
• All adhesive residue must be removed to ensure proper installation;
• The subfloor must be level, with a flatness tolerance of no more than 1/8 inch (3mm) over a 4-foot (approximately 1.22m) span. Areas exceeding this tolerance must be sanded or filled with a floor leveling compound; gaps or bumps in the subfloor will prevent the SPC flooring from locking together correctly;
• SPC flooring is waterproof, but moisture problems in the subfloor must be corrected before installation (humidity below 35% or above 60% requires treatment);
• New concrete floors require at least 60 days of curing; when installing on a concrete slab, a 0.6mm thick polyethylene film must be laid and the seams sealed to prevent moisture penetration that could cause residue on the floor surface;
• Existing sheet vinyl flooring should not have a thick cushioning layer; soft underlayment and substrates will reduce the strength of the product;
• Do not use solvents or citrus-based adhesive removers to remove old adhesive residue. Solvents remaining in or on the subfloor may affect the new floor covering;
• A minimum of 1/2 inch (approximately 12.7mm) spacing must be maintained between the radiant heating system and the product;
• The maximum operating temperature must not exceed 85°F (30℃);
• The use of a floor temperature sensor is recommended to prevent overheating.