Phone/WhatsApp
+86-136-5635-1589
You are here: Home » Blogs » People May Ask » SPC Flooring Installation Guide (Part 1-Pre-Installation Guide)

SPC Flooring Installation Guide (Part 1-Pre-Installation Guide)

Views: 0     Author: Site Editor     Publish Time: 2026-02-04      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button

(I) Tools Required

Tape measure, utility knife, jigsaw, tapping block or rubber mallet, pull bar, 1/4-inch spacers, right-angle ruler, safety glasses, broom or vacuum cleaner, and tools for subfloor repair if necessary.


(II) Furniture and Equipment Protection

Furniture that is frequently moved should be equipped with felt pads to prevent scratching the floor;

Heavy furniture and appliances require large-surface, non-staining floor protectors;

Furniture with casters or wheels must be able to rotate freely, and the casters/wheels should be large-surface, non-staining, and suitable for resilient flooring;

Ball casters are prohibited to prevent damage to the floor.


(III) Environmental Requirements

This product can be installed on ground level, above ground level, or below ground level areas, and is suitable for environments such as "three-season rooms and residences"—environments that are consistently without temperature control or with minimal temperature control, where temperature and relative humidity fluctuate with the seasons;

Before installation, the room temperature and humidity of the installation area must be consistent with normal year-round living conditions for at least one week;

The ambient temperature must be maintained between 55°F (approximately 12.8°C) and 85°F (approximately 29.4°C) for 72 hours before installation, during installation, and for 72 hours after installation;

Failure to comply with the above installation parameters will void the warranty.


(IV) Other Precautions

Excessive moisture in the subfloor can lead to mold growth, mildew, and other moisture-related problems, resulting in an unhealthy indoor environment. We are not responsible for damage caused by such moisture problems; when installing on a concrete subfloor, it is recommended to use a 6-mil (approximately 0.15mm) thick polyethylene film;

Avoid exposing the flooring to direct sunlight for extended periods, as this can cause fading and expansion. Use curtains, blinds, or protective window film;

Flooring installation should only be performed after all other construction procedures that could potentially damage the flooring have been completed;

All subfloor repairs must be completed with Portland cement-based compounds and be completely dry/cured before installation;

Please inspect all flooring planks for damage before installation. Claims/returns will not be accepted for cut and/or installed flooring;

Mix planks from multiple boxes during installation.


Related Products

A large-scale modern enterprise integrating product design, manufacturing, production, international trade and overall home decoration design.

QUICK LINKS

PRODUCT CATEGORY

OTHERS LINKS

Copyright ©  2024 Shandong Baoshang Plastic Co., Ltd. All Rights Reserved. Supported by leadong.com